[1]
2015. PRODUCTION SCHEDULING PROBLEM SOLVING USING GENETIC AND GREEDY ALGORITHMS WITH SEQUENCE- DEPENDENT SET-UP TIMES. Journal of Manufacturing Engineering. 10, 3 (Sep. 2015), 166–170.